what is Process Flow Diagram for CBG Napier Grass

Process Flow Diagram (PFD) for a Compressed Bio-Gas (CBG) plant using Napier Grass

  • A Process Flow Diagram (PFD) for a Compressed Bio-Gas (CBG) plant using Napier Grass shows the complete conversion of fresh Napier grass into compressed biomethane (CBG) and bio-fertilizer.
  • Modern CBG plants typically include feedstock preparation, anaerobic digestion, biogas cleaning, upgrading, compression, and digestate processing. (Biopower)
Bio CNG_Digestor
Bio CNG_Digestor

Typical Process Flow Diagram (PFD)

 

                     NAPIER GRASS

                          │
                          ▼
                 Weighbridge & Sampling
                          │
                          ▼
                  Feedstock Storage Yard
                          │
                          ▼
               Conveyor + Metal Separator
                          │
                          ▼
                    Grass Chopper
                 (10–30 mm particle size)
                          │
                          ▼
            Slurry Preparation / Mixing Tank
           (Water + Recycle Digestate Added)
                          │
                          ▼
                  Feed Feed Pump
                          │
                          ▼
        ┌─────────────────────────────────────┐
        │ Anaerobic Digester (CSTR/PFR)       │
        │ Mesophilic: 35–38°C                 │
        │ HRT: 45–60 Days                     │
        └─────────────────────────────────────┘
                 │                     │
                 │                     │
                 ▼                     ▼
           Raw Biogas             Digestate
                 │                     │
                 │              Screw Press
                 │                     │
                 │           ┌─────────┴──────────┐
                 │           ▼                    ▼
                 │     Solid Bio-manure     Liquid Fertilizer
                 │
                 ▼
          Moisture Separator
                 │
                 ▼
      Biological H₂S Removal Tower
                 │
                 ▼
      Activated Carbon Polishing Filter
                 │
                 ▼
            Gas Chiller & Dryer
                 │
                 ▼
          Gas Booster Compressor
                 │
                 ▼
       Membrane / PSA / VPSA Upgrading
                 │
         ┌───────┴─────────┐
         ▼                 ▼
     Biomethane         CO₂ Vent/Recovery
   (97–99% CH₄)
         │
         ▼
    High Pressure Compressor
        (250 bar)
         │
         ▼
    Cascade Storage Cylinders
         │
         ▼
   CBG Dispensing / Cylinder Filling

Major Process Sections

Section Main Equipment Purpose
Feed handling Conveyor, shredder, storage hopper Reduce particle size and ensure uniform feeding
Slurry preparation Mixing tank, agitator, feed pump Prepare pumpable slurry
Anaerobic digestion CSTR or Plug Flow Reactor Convert biomass into biogas
Gas collection Double-membrane gas holder Buffer raw biogas production
H₂S removal Biological scrubber, activated carbon Protect downstream equipment
Moisture removal Chiller, moisture separator, dryer Reduce water content
Gas upgrading Membrane, PSA, or VPSA Remove CO₂ to produce biomethane
Compression Multi-stage compressor Compress gas to ~250 bar
Storage Cascade cylinders Store CBG before dispatch
Digestate treatment Screw press, lagoons, fertilizer tanks Produce solid and liquid bio-fertilizers

Parameter Typical Value
Feedstock Napier Grass
Total Solids (TS) 12–15%
Hydraulic Retention Time (HRT) 45–60 days
Digestion Temperature 35–38°C (Mesophilic)
Methane Content (Raw Biogas) 52–60%
Methane Content (Upgraded CBG) ≥95%
Compression Pressure 200–250 bar
H₂S after purification <10 ppm
CO₂ after upgrading <2–3%
Moisture Dew Point Below specification for CBG

 

Typical Material Flow (Example: 6 TPD CBG Plant)

Stream Approximate Quantity
Napier grass 180–220 TPD
Slurry to digester 350–450 m³/day
Raw biogas 12,000–14,000 Nm³/day
Methane concentration 52–58%
Upgraded biomethane ~8,000–8,500 Nm³/day
CBG production ~6 TPD
Digestate 250–350 TPD

These values are indicative and depend on the Napier grass dry matter, volatile solids content, operating temperature, and methane yield. (Biopower)

Design Recommendations for Napier Grass

  • Feedstock: Chopped to 10–20 mm for better digestion.
  • Digester type: Plug Flow Reactor (PFR) or Continuous Stirred Tank Reactor (CSTR), depending on solids content.
  • Operating temperature: Mesophilic (35–38°C) is the most common for commercial plants.
  • Hydraulic Retention Time (HRT): 45–60 days.
  • Gas upgrading: Three-stage membrane systems or VPSA are commonly used for producing vehicle-grade CBG. (PNGRB)

For EPC engineering, this PFD is typically followed by:

  1. Process and Instrumentation Diagram (P&ID)
  2. Equipment sizing calculations
  3. Mass and energy balance
  4. Plant layout (GA drawing)
  5. Utility flow diagram
  6. Electrical single-line diagram (SLD)
  7. PLC/SCADA control philosophy

These documents together form the basis for detailed engineering, procurement, construction, and commissioning of a commercial CBG plant.

<