BioCNG CBG Plant Design -Training Centre in Pune

CBG Plant -Engineering Design and Training in Pune

Dinesh Jadhav, Experienced CBG Trainer

DL jadhav_sir

  • He is a Qualified Graduate Mechanical Engineer, with Post Graduation in Machine Design
  • More than 40 years of proven multifarious practical Experience:
    • Energy Auditor in 2006
    • Experience:
      • Services in Biomass Energy solutions
      • troubleshooting in Boiler Power Generation, and power plant maintenance
    • Energy  Audit   for Thermal & Electrical
  • Experinced in cost effective solutions for Design and development of CBG Plant using Nappier plant and residuels

Contact Cost Effective CBG Solutions 

E-Mail: cfdflowengineering@gmail.com, info@cfdflowengineering.com

What’s app contact:+91- 7774018223

Scope of CBG Plants in India 

  • India has significant potential for CBG production because of its large agricultural sector, cattle population, food-processing industry, municipal organic waste generation and wastewater treatment infrastructure.
  • CBG plants can convert these waste streams into fuel, organic manure and other useful products while supporting waste management and rural economic development.
  • India’s CBG sector is entering a major development phase. The Ministry of Petroleum and Natural Gas launched the SATAT initiative in 2018 to encourage CBG production and procurement. In 2026, the Union Cabinet approved the new GOBARdhan national scheme with a total outlay of ₹23,731 crore, covering FY 2026–27 to FY 2035–36. Its framework includes support for CBG offtake, pricing, capital assistance, pipeline infrastructure and access to finance. Actual eligibility and assistance depend on the applicable guidelines

Cost of CBG -Online Training starts from Rs 500,USD 10

Module 1: Feedstock and plant feasibility

  • Napier grass, press mud, cattle dung, food waste and other organic feedstocks

  • Feedstock characterization, biogas yield and methane potential

  • Plant capacity selection and preliminary feasibility

Module 2: Digester design

  • Mesophilic and thermophilic digestion

  • Hydraulic retention time (HRT), organic loading rate (OLR) and solids concentration
  • Digester sizing, heating, mixing and feed preparation

Module 3: Biogas purification and upgrading

  • Hâ‚‚S removal, moisture removal and COâ‚‚ separation
  • Water scrubbing, PSA/VPSA and membrane technologies
  • Methane recovery, gas quality and process calculations

Module 4: Compression and plant engineering

  • Gas compression, storage cascades and dispensing

  • PFD, P&ID, equipment sizing and instrumentation

  • Safety systems, commissioning, troubleshooting and plant economics

Training Modules for Bio-CNG/CBG Plant Design

  • A comprehensive Bio-CNG (Compressed Biogas / CBG) Plant Design Training Program should cover the complete project lifecycle, from biomass feedstock selection and biogas potential estimation to digester design, gas purification, compression, storage, PFD/P&ID development, equipment sizing, costing, and plant commissioning.
  • For engineering professionals in India, the training can be structured around a practical design project using feedstocks such as Napier grass, press mud, cattle dung, food waste, sugar-industry waste, and organic effluent.

1. Proposed training curriculum

Turning Agricultural Waste into Clean Energy with Bio-CNG Systems | INDRANIL CHAKRABORTY posted on the topic | LinkedIn

Module 1 — Feedstock Assessment and Biogas Potential

Duration: 4–6 hours

  • Feedstock characterization: TS, VS, moisture, C/N ratio, pH and COD.

  • Methane yield and biogas potential estimation.

  • Feedstock availability, seasonal variation and storage.

  • Laboratory BMP testing and preliminary feasibility.

What is Solid Feeding in Anaerobic Digestion?

Module 2 — Feed Preparation and Slurry System

Duration: 4–6 hours

  • Chopping, shredding, pulping and mixing.

  • Slurry preparation and dilution-water requirements.

  • Feed tanks, pumps, agitators and screening.

  • Feed rate, solids concentration and pretreatment selection.

Anaerobic Digestion (AD) effluent treatment consulting engineers

Module 3 — Anaerobic Digester Design

Duration: 8–10 hours

  • CSTR, plug-flow and high-solids digestion systems.

  • Hydraulic retention time (HRT) and organic loading rate (OLR).

  • Digester volume, geometry, mixing and heating calculations.

  • Mesophilic versus thermophilic operation.

  • Gas holder, insulation, recirculation and digestate handling.

Biogas filter, condensate trap,

Module 4 — Raw Biogas Collection and Conditioning

Duration: 4–6 hours

  • Gas composition: CHâ‚„, COâ‚‚, Hâ‚‚S, water vapour and trace contaminants.

  • Gas piping, condensate traps, blowers and pressure control.

  • Moisture removal, gas cooling and filtration.

  • Gas flow measurement and safety provisions.

Biogas Purification Unit Process Overview | Franco Troncoso posted on the topic | LinkedIn

Module 5 — Biogas Upgrading to Bio-CNG

Duration: 8–10 hours

  • Hâ‚‚S removal: biological, iron-based and activated-carbon methods.

  • COâ‚‚ removal: water scrubbing, amine, PSA and membrane systems.

  • Gas drying and contaminant control.

  • Methane recovery, methane slip and product-gas quality.

  • Technology selection based on flow rate and gas composition.

About - Jyotech

Module 6 — Compression, Storage and Dispensing

Duration: 4–6 hours

  • Compressor capacity and pressure-ratio calculations.

  • Intercooling, aftercooling and gas drying.

  • High-pressure cascade storage and filling systems.

  • Pressure vessels, valves, instrumentation and hazardous-area considerations.

Enhancing Energy Processes and Facilities Redesign in an Anaerobic Digestion Plant for Biomethane Production

Module 7 — Process Engineering and Plant Layout

Duration: 6–8 hours

  • Process Flow Diagram (PFD) and Process & Instrumentation Diagram (P&ID).

  • Equipment datasheets, line sizing and pump selection.

  • Mass and energy balances.

  • General Arrangement (GA), piping layout and utility systems.

  • Control philosophy, alarms, interlocks and emergency shutdown.

Biogazownie w Polsce 2026 — ile jest, biometan i cel 1000 instalacji - BiomasaPortal

Module 8 — Safety, Economics and Commissioning

Duration: 6–8 hours

  • HAZID, HAZOP, gas detection and fire/explosion risk.

  • CAPEX, OPEX, energy consumption and operating costs.

  • Bio-CNG yield, revenue and payback calculations.

  • Start-up, biological commissioning and performance testing.

  • Digestate management and environmental compliance.

 Practical design project

The training should finish with a complete preliminary engineering package for a Bio-CNG plant.

Sample design assignment

Illustrative training project — not a validated plant design

Plant capacity

 TPD CBG

Design target

Feedstock

Napier grass

Alternative: mixed organic waste

Engineering deliverables

  • Feedstock requirement and methane-yield calculations.

  • Digester sizing based on HRT, OLR and measured feedstock characteristics.

  • Raw biogas production and mass balance.

  • Hâ‚‚S removal, COâ‚‚ separation and gas drying calculations.

  • Compressor, gas storage and utility sizing.

  • PFD, preliminary P&ID and equipment list.

  • Preliminary plant layout and CAPEX/OPEX estimate.

  • Digestate handling and safety review.

3. Recommended training duration

Training format Duration Suitable for
Fundamentals 3 days Beginners and project owners
Process design 5 days Mechanical and chemical engineers
Complete plant design 10–15 days Design consultants, EPC engineers and entrepreneurs
Advanced project engineering 3–4 weeks Engineers preparing a detailed project package

These are proposed course durations, not confirmed schedules from a training provider.

4. Indian standards and reference material

Use current official documents while preparing the design:

<